West Virginia data center policy
State policy, local approvals and the questions that shape development in West Virginia.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
West Virginia's Power Generation and Consumption Act of 2025 lets certified microgrid districts serve High Impact Data Centers of 90 MW or more that start operating after 1 July 2025. These are exempt from PSC siting certificates, rate jurisdiction and net metering rules, and districts of 300 MW or more need not negotiate with the utility at all. Commerce filed the certification rules on 10 November 2025. Property tax revenue from these projects is split, with 50% going to income tax cuts and 30% to host counties.
What to check for a proposed site
The state-level position is the starting point. A project in West Virginia also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.