State policy context

Washington narrowed its long-standing data center tax preference in 2026. The new law took effect on 11 June 2026, with the exemption changes from 1 July 2026. It removed the sales and use tax exemption for replacement servers, equipment repair and refurbishment, and installation labour, affecting more than 100 rural and urban facilities. JLARC's 2026 review of the tax preference for urban county data centers recommended letting that exemption expire. The UTC opened a policy statement proceeding on large-load interconnections and tariffs on 16 March 2026, with workshops on 27 April and 12 August 2026.

What to check for a proposed site

The state-level position is the starting point. A project in Washington also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.