Virginia data center policy
State policy, local approvals and the questions that shape development in Virginia.
Research baseline: October 24, 2026. Published November 9, 2026.
State policy context
The 2026 budget, signed on 30 June 2026, keeps the data center equipment sales and use tax exemption through 30 June 2035. It also adds an electricity consumption tax of 1.1 cents per kWh from 1 July 2026, capped at $600 million a year and expiring on 30 June 2028, with a tax policy study by a Joint Subcommittee due on 15 December 2026. Governor Spanberger signed three further laws after amending several in April 2026: a permit process for facilities of 100 MW or more, cost allocation rules for customers of 25 MW or more, and a demand flexibility measure. On 9 October, the Senate prefiled SB 843 for the 2027 session. It would bar final local approvals and state permits for data centers from 1 July 2027 through 30 June 2030. The bill is proposed, not enacted.
What to check for a proposed site
The state-level position is the starting point. A project in Virginia also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.