Vermont data center policy
State policy, local approvals and the questions that shape development in Vermont.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
Vermont offers no data center tax incentive and has no PUC large-load tariff or interconnection route. In 2026 the legislature passed a bill that would have defined data centers as 20 MW and above, required a PUC-approved large load service equity contract meeting reliability, economic and environmental justice tests, and required quarterly water and energy reporting. Governor Scott vetoed it on 28 May 2026, saying Act 250, PUC oversight and municipal zoning were already enough. A separate four-year statewide moratorium bill did not advance.
What to check for a proposed site
The state-level position is the starting point. A project in Vermont also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.