Texas data center policy
State policy, local approvals and the questions that shape development in Texas.
Research baseline: November 6, 2026. Published November 9, 2026.
State policy context
Texas keeps its data center sales tax exemption and the 2025 large-load rules. Under those rules the PUCT adopted interconnection standards on 18 September 2026: loads of 75 MW or more must post security of $50,000 per MW plus a $100,000 study fee. The exemption is under review. At a Senate Finance hearing on 27 July 2026 the Comptroller reported that six of 20 audited data centers had missed their job requirements. On 21 September 2026 Governor Abbott said he will seek to eliminate data center incentives in the session starting January 2027.
What to check for a proposed site
The state-level position is the starting point. A project in Texas also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.