Tennessee data center policy

State policy, local approvals and the questions that shape development in Tennessee.

Research baseline: September 27, 2026. Published November 9, 2026.

State policy context

The state incentive remains: data centers that invest $100 million and create 15 jobs are exempt from sales tax on equipment and pay a reduced rate on electricity. What changed in 2026 is who pays for the grid. A law signed in May stops cities and utilities from absorbing grid upgrade costs for facilities of 50 MW or more, and lets projects build their own generation. In August the TVA board then put data centers on their own rate: any load above 5 MW moves to a dedicated schedule from October 2026, with prices rising in two steps over the next two years to roughly 10% above today. New or expanded load also pays a one-off charge of about $1.5 million per MW, and projects that were already well advanced by June 2026 are exempt. Data centers lose access to the cheaper manufacturing rates by October 2027, and anything above 100 MW now needs TVA board sign-off.

What to check for a proposed site

The state-level position is the starting point. A project in Tennessee also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.