State policy context

Governor Rhoden signed the Data Center Bill of Rights for Citizens on 25 March 2026. Data centers with peak demand of 10 MW or more must cover all the costs of meeting their power needs, including exit costs. They must notify local water providers and obtain a local finding that their water use is compatible with supply. The law also stops the state from overriding local data center ordinances. A companion measure lets the PUC charge developers for its review costs. Three incentive bills failed, including a 50-year sales tax exemption on equipment and software.

What to check for a proposed site

The state-level position is the starting point. A project in South Dakota also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.