Oregon data center policy

State policy, local approvals and the questions that shape development in Oregon.

Research baseline: September 27, 2026. Published November 9, 2026.

State policy context

Oregon has stacked three state actions. The 2025 POWER Act required large loads to carry their own costs. The PUC implemented it with a new PGE schedule: a surcharge of 1 cent per kWh on customers with 100 MW or more of allocated capacity, plus clean energy verification. Pacific Power has a parallel tariff. A law effective 5 June 2026 bars new data centers from enterprise zone tax abatements until 90 days after the 2027 session ends. Existing agreements and the Strategic Investment Program are not affected.

What to check for a proposed site

The state-level position is the starting point. A project in Oregon also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.