North Dakota data center policy

State policy, local approvals and the questions that shape development in North Dakota.

Research baseline: September 27, 2026. Published November 9, 2026.

State policy context

North Dakota offers a broad sales tax exemption for qualified data centers, reenacted in 2021 with a 15,000 square foot minimum and annual reporting. Claims rose from $5.4 million in 2021 to more than $65 million in 2025. A 2025 bill that would have required data centers to get a certificate of public convenience and necessity was turned into a grid impact study instead. On 25 June 2026 the Legislature set up an interim Artificial Intelligence and Data Center Committee with the governor's support. There is no state-level siting review.

What to check for a proposed site

The state-level position is the starting point. A project in North Dakota also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.