Missouri data center policy
State policy, local approvals and the questions that shape development in Missouri.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
Missouri pairs incentives with a defined utility route. The state still exempts qualifying data storage centers from state and local sales tax on equipment, utilities and construction materials for up to 15 years. A law signed on 9 April 2025 required the PSC to set large-load rates that stop costs shifting to other customers. On 24 November 2025 the PSC approved plans from Evergy and Ameren Missouri with 75 MW thresholds, 12-year terms and two years of collateral. Eight bills in 2026 to restrict or tax data centers all died.
What to check for a proposed site
The state-level position is the starting point. A project in Missouri also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.