Mississippi data center policy
State policy, local approvals and the questions that shape development in Mississippi.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
Mississippi's Data Center Incentive Program gives 10-year sales and use tax exemptions on construction materials and equipment, plus income and franchise tax exemptions, to MDA-certified operators that invest $20 million and create 20 jobs paying 125% of the state average wage. A law passed in a January 2024 special session added $44 million in appropriations, a $215 million infrastructure loan and a permanent equipment exemption for Amazon's $10 billion Madison County project. Compass Datacenters' $10 billion Meridian campus, announced on 9 January 2025, uses the standard program.
What to check for a proposed site
The state-level position is the starting point. A project in Mississippi also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.