RegLayer
All states

Kentucky data center policy

State policy, local approvals and the questions that shape development in Kentucky.

Research baseline: September 27, 2026. Published November 9, 2026.

State policy context

The state posture is pro-development. A 2025 law became law on 27 March 2025 without the governor's signature and took effect on 27 June 2025. It extended the data center sales and use tax exemption from Jefferson County to the whole state. The investment thresholds are $450 million in counties over 100,000 people, $100 million in mid-size counties and $25 million in small counties. On 28 October 2025 the PSC approved LG&E/KU's two roughly 645 MW gas units, Brown 12 and Mill Creek 6. In its rate case orders of 16 February 2026 it approved an Extremely High Load Factor tariff for new large customers with a 50 MVA minimum. It also approved EKPC's data center tariff, which requires a 15 MW minimum, six-month deposits and full cost allocation. The ratepayer-protection bill died on 15 April 2026.

What to check for a proposed site

The state-level position is the starting point. A project in Kentucky also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.

Sources and further reading