Kansas data center policy
State policy, local approvals and the questions that shape development in Kansas.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
Kansas passed its data center incentive in April 2025: a 20-year sales and use tax exemption for projects investing $250 million and creating 20 jobs. In return, projects must commit to a utility for 10 years, adopt water conservation measures and pass a security review, and they cannot use discounted economic-development electric rates. The KCC approved Evergy's Large Load Power Service tariff on 6 November 2025 for loads of 75 MW or more, with 12-year terms, minimum bills of 80% and two years of collateral. A further law signed on 9 April 2026 extended large-load carve-outs to 2027. Three bills to restrict data centers died.
What to check for a proposed site
The state-level position is the starting point. A project in Kansas also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.