Indiana data center policy

State policy, local approvals and the questions that shape development in Indiana.

Research baseline: September 27, 2026. Published November 9, 2026.

State policy context

Indiana's data center sales tax exemption still stands. It runs 35 years for projects of $1 billion or more and can be extended to 50. A 2025 law makes large loads cover at least 80% of the grid costs they cause. A law signed on 12 March 2026 adds a modest condition: projects approved locally after 30 June 2026 must agree local payments of up to one cent per exempted dollar. Another law orders a study of what the incentive costs, due 1 November 2026. No state cap or pause passed.

What to check for a proposed site

The state-level position is the starting point. A project in Indiana also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.