Illinois data center policy
State policy, local approvals and the questions that shape development in Illinois.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
On 5 June 2026 Governor Pritzker told DCEO to stop processing new applications for the Data Center Investment Program from 1 July 2026. Agreements signed before that date are honoured. No end date was set. The POWER Act died in committee in May 2026. Pritzker is pressing for it to pass in the veto session that begins on 17 November. The Illinois Commerce Commission approved ComEd's tiered deposits for large loads on 20 March 2026 and ordered a consumer-protection investigation into what it costs to connect them.
What to check for a proposed site
The state-level position is the starting point. A project in Illinois also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.