Hawaii data center policy

State policy, local approvals and the questions that shape development in Hawaii.

Research baseline: October 24, 2026. Published November 9, 2026.

State policy context

The legislature's HCR 206 asks the State Energy Office to study potential effects of large data centers, defined by instantaneous demand of at least 5 MW, and recommend possible safeguards or legislation. The report is due before the 2027 regular session. This is a study mandate, not a construction or permitting pause.

What to check for a proposed site

The state-level position is the starting point. A project in Hawaii also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.

Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.

This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.