Georgia data center policy
State policy, local approvals and the questions that shape development in Georgia.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
Georgia keeps its high-technology data center sales and use tax exemption through 31 December 2031. The 2026 session's repeal, sunset and suspension bills all failed. A bill to stop issuing new exemption certificates passed the Senate on 6 March 2026 but died in the House Ways and Means committee. Three other exemption bills and two moratorium bills never reached a floor vote. The PSC has a defined route for large loads. Rules adopted on 27 January 2025 cover customers of 100 MW or more, with minimum bills and PSC review of contracts. Base rates are frozen through 2028. On 19 December 2025 the PSC unanimously certified 9,885 MW of new Georgia Power generation to serve data center growth: 7,999 MW from the 2029 to 2031 all-source RFP plus 1,886 MW of supplemental resources.
What to check for a proposed site
The state-level position is the starting point. A project in Georgia also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.