State policy context
The 2021 incentive offers 20 or 30 year exemptions from sales, use and property tax for investments of $200 million, or $50 million in opportunity zones. A bill to halt new applications from 1 July 2026 died in the Finance Committee in March 2026. A law signed on 2 June 2026 moved the programme's administration directly to DECD and kept the exemptions. A separate bill that would have required new generation for loads over 50 MW died on the House calendar on 7 April 2026. On 4 February 2026 Governor Lamont said the state should slow data centers unless they add generation.
What to check for a proposed site
The state-level position is the starting point. A project in Connecticut also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.