Alabama data center policy
State policy, local approvals and the questions that shape development in Alabama.
Research baseline: September 27, 2026. Published November 9, 2026.
State policy context
The state incentive remains, but smaller. A law enacted on 17 April 2026 with unanimous support in both chambers limits abatements granted from 1 January 2027 to 20 years. They can run to 30 years only if the project makes defined community investment. Facilities of 100 MW or more must now pay state sales and use taxes. A second law, effective 1 October 2026, tells the Public Service Commission to review Alabama Power contracts with data centers of 150 MW or more, so the extra costs of serving them are recovered from that customer.
What to check for a proposed site
The state-level position is the starting point. A project in Alabama also needs a site-specific review of the city or county’s land-use rules, any adopted local restrictions, and the conditions attached to its approvals. A tax incentive or announced investment does not establish permission to build.
Track the serving utility’s large-load process alongside air permits for generators, water supply and wastewater arrangements, construction stormwater, and any applicable federal waters authorization. The required sequence depends on the parcel, equipment and design.
This public page summarizes the dated research baseline above. It is not a live inventory of every local measure or a determination that a particular parcel is eligible.